The Spa at Coworth Park

Our focus was on enabling essential structural repairs as well as concrete slab replacements at The Spa at Coworth Park.

At this project, our focus was on enabling essential structural repairs while maintaining a quiet, controlled environment for ongoing site operations. The Spa at Coworth Park is a luxury spa with first-in-class facilities.

Our team installed a heavy-duty temporary works propping system around existing decayed glulam (glue-laminated) columns, ensuring the structure remained fully supported throughout. We then removed the existing external concrete slab to make way for a new reinforced concrete slab and upstand, complete with waterproofing. As part of the works, we also upgraded the internal underground drainage system.

The biggest challenge came from removing the external concrete slab without disrupting daily spa sessions. Traditional pneumatic breakers were not an option due to noise restrictions, so we adopted a quieter and more controlled method — core drilling a series of holes and using hydraulic bursting equipment to carefully break down the concrete for disposal.

By combining precision, technical know-how, and innovative techniques, we successfully delivered the structural works with minimal disruption, laying the foundations for long-term stability and quality.