We were tasked with installing a new internal drainage system, including precise excavations and reinstatement works, as part of a regeneration at three railway arches in Waterloo.

On this project, we were tasked with installing a new internal drainage system, including precise excavations and reinstatement works to ensure the facility remained fully functional throughout. This was part of a regeneration at three railway arches on Wootton and Brad Street in Waterloo.

Our scope began with CAT and GENNY surveys to locate and mark existing cables, followed by internal disc cutting along the perimeters of new trenching. We broke through the concrete slab to allow excavations for the drainage runs, installed the new drainage system, pressure-tested the drains, and completed the reinstatement with compacted fill, DPM, mesh, dowel bars, and a reinstated concrete slab.

The most challenging aspect was the heavy internal concrete breakout. To overcome this safely, we used a three-phase electric-powered remote-controlled breaker, powered by an external generator. This innovative approach eliminated the risk of Hand Arm Vibration injuries and removed the need for operatives to use heavy hand-held breakers.

Through careful planning, precise execution, and the use of safe, innovative equipment, we delivered the drainage system efficiently, maintaining the integrity of the building while meeting all technical requirements.