Just a mile from Heathrow, we played a key role in the refurbishment of a major logistics warehouse, a site designed for both ambient and cold food storage. Our goal was to upgrade the unit to handle dock levellers and high bay access doors, boosting accessibility and day-to-day functionality.
Our team got to work with a mix of precision and heavy lifting. We carried out floor penetrations, concrete cutting, and drilling. Alongside this, we demolished walls, created new door openings, and blocked off redundant ones. We also handled drainage upgrades and built new concrete plinths for the AC plant, giving the site the strong foundations needed for new equipment.
By keeping the work accurate, efficient, and well-coordinated, we made sure the warehouse stayed on schedule with minimal disruption. The end result was a facility with smarter access, stronger infrastructure, and the right setup to keep storage and distribution running smoothly.