At British Museum ARC (BM_ARC), we were tasked with creating the foundations for a new sprinkler pump house and a high-capacity water tank. This project involved complex groundwork and structural work to ensure the new installations were built on solid, reliable foundations.
Our role included CAT and GENNY surveys to locate existing underground cables, excavations to divert existing surface water and foul drainage, and preparing the site for a new sprinkler main supply. We also installed strip concrete foundations, reinforced concrete slabs, and constructed reinforced concrete walls up to 1,200mm above floor level.
BM_ARC is the British Museum’s cutting-edge research space and storage facility in Berkshire. The primary aim of our work was to deliver robust foundations for the sprinkler house and large water tank, supporting the safe and efficient operation of critical site infrastructure.
One of the main challenges was working adjacent to a surface water swale during the winter months, which required careful management of water levels on site. We overcame this by over-pumping surface water to the downstream swale, keeping the works dry and on schedule.
By combining precise excavation, structural expertise, and proactive problem-solving, we successfully delivered the foundations and concrete structures to specification, setting the stage for a fully operational sprinkler system and water storage facility.